Sign In | Join Free | My himfr.com
Home > Boiler Membrane >

Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard

Zhangjiagang Dehai Boiler Co., Ltd
Contact Now
    Buy cheap Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard from wholesalers
     
    Buy cheap Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard from wholesalers
    • Buy cheap Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard from wholesalers
    • Buy cheap Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard from wholesalers
    • Buy cheap Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard from wholesalers
    • Buy cheap Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard from wholesalers

    Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard

    Ask Lasest Price
    Brand Name : Dehai Boiler
    Model Number : Membrane wall
    Certification : ISO9001 , SGS , ABS , ASME
    Price : Negotiable
    Payment Terms : L/C, T/T
    Supply Ability : 800 Tons / Month
    Delivery Time : 80 Days
    • Product Details
    • Company Profile

    Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard


    Water tube boiler membrane will with stubs pins lugs GB ASME fabrication standard

    Boiler Membrane Wall Introduction

    1. Nowadays, the steam boilers of waste incineration power plants are made specifically according to the requirements of investors.
    2. Due to the location where the boiler will be set up, the amount and type of fuel to be burned in a given time, and technical parameters of produced steam, the production of steam boilers is mainly individual.
    3. This represents an exceptional effort for the designers. The pipes and sheet metal are the basic structural elements used for making boilers.
    4. Larger structural units called the membrane walls are obtained by welding these elements. The membrane walls make the basic structure of boiler and have a double function.
    5.The heat exchanger, that is, evaporator, is the primary function, and the secondary is transfer of loading.
    6. The steam boiler membrane walls are loaded by the pressure of working fluid (water/steam), their own mass, and the mass of other structural units that rely on the membrane walls, the mass of working fluid, the mass of insulation and refractory, and the fouling mass that is deposited during the combustion process.
    7. The loading is transferred across the membrane walls to the boiler supports and then to the bearing steel structure.

    Water Tube Boiler

    1. Industrial watertube boilers are used primarily in district energy applications and process industries, including chemical manufacturing, paper manufacturing, and refining.
    2. Watertube boilers are generally manufactured in D- and O-style configuration and are used when high steam pressures are required – generally 100 psig pressure and higher.
    3. The D and O configuration describes the relationship of the steam mud drums and interconnecting tubes. Thermal efficiencies for watertube boilers without economizers are typically between 75% and 80%.
    4. The efficiency gain from adding a conventional flue gas economizer can be 3% to 5% or more.

    Advantages

    1. The protective effect of membrane water cooling wall on the furnace wall is the most complete, so the furnace wall only needs insulation materials, rather than refractory materials, so that the thickness and weight of the furnace wall are greatly reduced, simplify the structure of the furnace wall, reduce the total weight of the boiler.
    2. Membrane water wall also has good air tightness, can adapt to the requirements of positive pressure combustion on the boiler, not easy to slag formation, less air leakage, reduce the heat loss of smoke exhaust, improve the boiler thermal efficiency.
    3. it can be welded into components by the manufacturer for quick and convenient installation.
    4. the use of membrane wall structure of the boiler, simple maintenance, boiler service life can be greatly improved.

    Product Parameter
    NameMembrane water panel
    MaterialCarbon steel,Alloy,Stainless steel
    Tube sizeΦ38 - 76 mm, Customize
    StandardISO , ASME
    ModelStudded
    ApplicationIstallable around the boiler combustion chamber

    Material of base pipeCarbon steel,Alloy steel, Aluminium or Stainless
    Material of finsCarbon steel,Alloy steel,Aluminium or Stainless
    Type of base pipeSeamlesss,Welded
    Type of finswelded or whole
    OD of Base pipes15mm-219mm
    WT of base pipes1.5-6mm
    Width of fins6mm-30mm
    WT of fins0.8mm-3.0mm
    Length of blank areaaccording to Customer's request.
    Length of finned tubes≤23m


    Bending Accessory



    Welding Machine(SAW)

    Product Tags:

    water wall tubes

      

    boiler wall unit

      
    Quality Water Tube Boiler Membrane Will With Stubs Pins Lugs GB ASME Fabrication Standard for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhangjiagang Dehai Boiler Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)