Sign In | Join Free | My himfr.com
Home > Reheater In Boiler >

Pressure Controlling Reheater In Power Plant Improved Cycle Efficiency

Zhangjiagang Dehai Boiler Co., Ltd
Contact Now
    Buy cheap Pressure Controlling Reheater In Power Plant Improved Cycle Efficiency from wholesalers
     
    Buy cheap Pressure Controlling Reheater In Power Plant Improved Cycle Efficiency from wholesalers
    • Buy cheap Pressure Controlling Reheater In Power Plant Improved Cycle Efficiency from wholesalers
    • Buy cheap Pressure Controlling Reheater In Power Plant Improved Cycle Efficiency from wholesalers
    • Buy cheap Pressure Controlling Reheater In Power Plant Improved Cycle Efficiency from wholesalers

    Pressure Controlling Reheater In Power Plant Improved Cycle Efficiency

    Ask Lasest Price
    Brand Name : Dehai Boiler
    Model Number : Reheater
    Certification : ISO9001 , SGS , ABS , ASME
    Price : Negotiable
    Payment Terms : L/C, T/T
    Supply Ability : 800 Tons / Month
    Delivery Time : 45 Days
    • Product Details
    • Company Profile

    Pressure Controlling Reheater In Power Plant Improved Cycle Efficiency

    Industrial Steam Boiler Pressure Parts Steam Super heater Re-heater Tubes heat energy


    Boiler Pressure Parts Introduction


    1. Boiler tubes are generally exposed to high pressure and temperature of steam internally, and high tem-perature of combustion externally .

    2. Corrosive elements in both of them may cause severe damage to theinside and outside of the tubes. Many research works have indicated that the safe and corrosion freeoperation of boiler requires proper water monitoring and treatment.

    3. This should also be extended to fuelconditions, operating and maintenance regime, during on and off periods. Under normal operation condi-tion of boiler, a protective oxide layer of Fe304 is being formed inside the tubes.

    4. Accumulation of elements,such as sodium in areas like U-bends of the tubes and at water lines, deteriorates the oxide layer, so thatfresh surface of metal is continuously oxidized and thinning goes on till a pin hole like damage appears.

    5. In this paper, failure analysis and affecting parameters were studied and corrosion mechanisms wereidentified


    Reheater Function


    1. Therefore the number of reheat stages can not be many as the pressure drop will reduce efficiency of thermal cycle.The steam pipes and reheater coils are to be so designed to limit the drop to 2–3%.


    2. The control valves in reheat steam path is not desirable.Systems using HP LP bypass require these valves to control steam flow during bypass operation.


    3. The efficiency of the Reheat cycle can be improved by increasing the pressure and temperature of steam entering into the turbine. As the initial pressure increases the expansion ratio of the turbine also increases and the steam becomes quite wet at the end of expansion.


    Main Advantage


    The main advantage of reheat cycle is to reduce the specific consumption and consequently reduce the size of the boiler and other auxilaries for the same power.The reheat cycle is preffered for the high capacity above 100 MW plant.


    Differences


    TypeAdvantagesDisadvantagesSupporting method
    Pendant-type1.Firm structural support1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom.supported from above
    Inverted-type1.Proper drainage of the condensed steam1. Lack the structural rigidity, especially in high speed gas flowSupported from below
    Horizontal -type

    1. Proper drainage

    2. Good structural rigidity.

    1. They do not view the flam directly so they are mainly from the convective typeUsually supported in the vertical gas ducts parallel to the main furnace.

    Assemblying

    100% RT Test



    Squeezing



    Product Tags:

    reheater in power plant

      

    water reheater

      
    Quality Pressure Controlling Reheater In Power Plant Improved Cycle Efficiency for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhangjiagang Dehai Boiler Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)